May 17th

For once I can post some good news. A huge thank-you to Donny and his
crew to abandon their own crises and install the docks at the main
landing, including the painted trail dock. Alas however, the dock stub
and cribs at the CAMP have been totally destroyed and scoured away.
This will be a major project. Also reported is a fire hose with nozzle
was found in Meisner bay and will be at McCartneys. Unknown if there
was a pump on the other end. With the amount of shoreline erosion, up
to 6 feet or better in some locations, this isn’t surprising. The lake
has a huge amount of detrius floating around.