After a brief shut down in November and early December, during freeze up, equipment returned to the area west of Malachi between Christmas and New Years. Cutting and hauling resumed on January 4 th. Traffic on the White Road is throughout the daylight hours. With equipment operators going to and from their work sites and the logging trucks going in empty and going out loaded, the road is fairly busy.
Please remember :
- Log trucks have the right of way. With the winter conditions it is better to stop and let them pass.
- There are five log trucks hauling two loads a day each and that could increase as the cutting progresses.
Logging will continue this winter, spring, summer and fall right into next winter.
Please —
- Be Cautious
- Be Courteous
- Be Safe